Road to NAB
Phase 8: Branding & Commissioning

In the final phase of making our trailer production-ready, the engineer in charge coordinates with the hardware manufacturers to make sure all of the equipment is running through their paces. The trailer also gets some finishing touches; a company logo decal on the outside and back, new cobalt chairs to accommodate the 24 seating positions available inside, multi-screen 4K monitors for the control room and Boland OLED monitors for the video room. Now it's time to show it off; the tractor is gassed up, the engine is revving, and we are ready to put the peddle to the metal on the road to NAB.